Project 1
Construction of Two lane with paved shoulder from Km.0 to Km. 80 on NH 548B (Vijayapura- Sankeshwar section) in the state of Karnataka on Hybrid Annuity Mode (HAM) Contract
Project 2
Six Lanning of Chittorgarh-Udaipur Section of NH-76 from km 278.87 to Km
308.37 in the state of Rajasthan (Length Approx 29.500 km)
Project 3
Facade elevation work done on Third space multi floor building/

Project 1
Four laning of Ratnagiri Kolhapur section of NH-166 Package I from km 0.000 to km
19.769 and km 31. 000 to 67.140 in Maharashtra to be executed on Hybrid Annuity
Mode under NH (O)
Project 2
Four Laning of Tumkur-Shivamogga Section from Km. 12+310 (Design Km. 12+300) to Km. 66+540 (Design Km. 65+195) from Mallasandra to Karadi Village of NH-206 under NHDP-Phase-IV on hybrid Annuity Mode, in the State Karnataka (Package-I)
Project 3
Four Laning of Tumkur – Shivamogga section from Km. 66+540 (Design Ch. 65+195) (Karadi) to Km. 119.970 (Design Ch. 121.900) (Banwara) of NH-206 under NHDP- PHASE-IV on HAM in the state of Karnataka (Package-II)
Project 4
Four laning of Tumkur- Shivamogga section from Ch.170+415 km to Ch.226+750Km, Bettadahalli Shivamogga of NH-206 on Hybrid annuity mode under Bharatmala Pariyojna in the state of Karnataka (Package-IV).
Project 5
Four lanning of Tumkur – Shivamogga section from Km. 121+900 (Banwara) to Km. 170+415 (Bettadahalli) section of NH-206 in the state of Karnataka on Hybrid annuity mode under Bharatmala Pariyojana (Package-III).